您好,欢迎光临济南泉谊机械科技有限公司网站!

服务热线

李经理13695310799
热门搜索:军事模型 航天模型 飞机模型 坦克模型 变形金刚模型 钢雕模型
您当前所在位置 首页>>新闻动态>>行业资讯大型机器人模型的工艺流程及安装

大型机器人模型的工艺流程及安装

发布时间:2022-04-04 来源:http://www.quanyimoxing.com/

大型机器人模型的工艺流程及安装的内容您知道多少呢?为了让我们后期的运用更加得当且顺利,应该对这个问题进行充足的了解,下面大型机器人模型制作人员为您讲解。
How much do you know about the process flow and installation of large robot models? In order to make our later use more appropriate and smooth, we should have a sufficient understanding of this problem. The following large-scale robot model makers will explain it to you.
大型机器人模型产品的工艺流程:装箱情况,包装、运输
Process flow of large robot model products: packing, packaging and transportation
1、采用专用存放架,存放架一般为木质或碳钢支架或垫以橡胶垫,以与碳钢等其它金属材质隔离。存放时,储存位置应便于吊运,与其它材料存放区相对隔离,有防护措施,以避免灰尘、油污、铁锈对不锈钢的污染。
1. Special storage racks are used. Generally, the storage racks are wooden or carbon steel supports or rubber pads to isolate them from other metal materials such as carbon steel. During storage, the storage location shall be convenient for lifting, relatively isolated from the storage area of other materials, and protective measures shall be taken to avoid pollution of stainless steel by dust, oil stain and rust.
2、吊装时,采用专用吊具,严禁使用钢丝绳以免划伤表面;在起吊和放置时,避免冲击磕碰造成划伤。
2. During hoisting, special lifting tools shall be used, and steel wire rope shall not be used to avoid scratching the surface; When lifting and placing, avoid scratching caused by impact and collision.
3、运输时,应用运输工具(如绑带),洁净有隔离防护措施,以防灰尘、油污、铁锈污染大型机器人模型。严禁拖拉,避免磕碰、划伤。
3. During transportation, transportation tools (such as bandages) shall be applied, and clean and isolated protective measures shall be taken to prevent dust, oil stain and rust from polluting the large robot model. Dragging is strictly prohibited to avoid collision and scratch.
大型机器人模型制作
大型机器人模型如何安装
How to install a large robot model
基础放样→基坑开挖→垫层施工→基座结构施工→大型机器人模型安装→装饰贴面→清扫(基础放样→基坑开挖→垫层施工→基座结构施工)由甲方(客户方)完成,(大型机器人模型安装→装饰贴面→清扫)由乙方(我方)完成。
Foundation setting out → foundation pit excavation → cushion construction → base structure construction → installation of large robot model → decoration and veneering → cleaning (Foundation setting out → foundation pit excavation → cushion construction → base structure construction) shall be completed by Party A (client) (installation of large robot model → decoration and veneering → cleaning) shall be completed by Party B (we).
大型机器人模型经过设计师设计,身体各个部分比例协调,充满了力量的阳刚之美。加工材料选取好的钢板,经过精心钣金,细致焊接后成型,佐以调色喷漆师傅进行色彩的调配与喷涂,以达到很好的效果。经质检人员检验合格后出厂。
The large-scale robot model is designed by the designer, and the proportions of all parts of the body are coordinated, which is full of strength and masculine beauty. The steel plate with good processing materials is formed after careful sheet metal and welding, and assisted by professional color mixing and painting masters to coordinate and spray colors, so as to achieve good results. The products shall be delivered after passing the inspection by the quality inspection personnel.
此外与传统的雕塑和石雕作品相比,大型机器人模型有着鲜明的特征,大型机器人不爱生锈,放的过程中不需要花很多的时间进行保养,同时也不用担心大型机器人在摆放的过程中,会因为大气、雨水而发生生锈的现象。
In addition, compared with traditional sculptures and stone carvings, large-scale robot models have distinct characteristics. Large robots do not like to rust, and do not need to spend a lot of time in maintenance during the process of placing. At the same time, there is no need to worry that large robots will rust due to the atmosphere and rain during the process of placing.
我公司拥有的安装团队,您提供安装图纸,我公司可以提供技术安装指导。当然您的需求以及相关疑惑都会得到解答,欢迎来我们网站http://www.quanyimoxing.com了解更多事项!
Our company has a professional installation team. If you provide installation drawings, our company can provide technical installation guidance. Of course, your needs and related doubts will be answered. Welcome to our website http://www.quanyimoxing.com Learn more!
-